HEIDENHAIN 238-1022 - 1022 UVR DC-link voltage low: charging circuit activated
HEIDENHAIN alarm 238-1022 occurs when the DC-link voltage in the power supply unit drops below the minimum threshold, triggering the charging circuit to activate. This typically indicates power supply degradation, input voltage issues, or excessive load conditions on the TNC system.
HEIDENHAIN 238-1022 - 1022 UVR DC-link voltage low: charging circuit activated
1022 UVR DC-link voltage low: charging circuit activated
The UVR charging circuit activated due to low DC-link voltage. The system is attempting to recover from a voltage sag condition.
Root Cause Summary
HEIDENHAIN alarm 238-1022 occurs when the DC-link voltage in the power supply unit drops below the minimum threshold, triggering the charging circuit to activate. This typically indicates power supply degradation, input voltage issues, or excessive load conditions on the TNC system.
Safety
Causes and Fixes
Check input voltage at power supply
Measure AC input voltage at the power supply terminals. Verify voltage is within ±10% of rated voltage (typically 400V/480V 3-phase).
Use proper PPE and lockout procedures when measuring high voltage
Monitor voltage stability
Use oscilloscope or power quality analyzer to check for voltage dips, spikes, or phase imbalances during machine operation.
Check voltage during spindle acceleration and axis rapid moves when power demand peaks
Verify facility power quality
Check building electrical system for loose connections, overloaded circuits, or transformer issues affecting the CNC power supply.
Coordinate with facility maintenance to check upstream electrical components
Call a technician if:
Prevention
Common Mistakes
Seeing Multiple Alarms?
Seeing another alarm with this one? Enter the code.
AxisMD logs alarms against your actual machines, tracks patterns, and gives AI context your manual doesn't have.
Start freeWas this guide helpful?
Always verify with your machine manual or a certified technician before performing service procedures.